CK Flare Piping System
Shortening construction time and solving the shortage of skilled workers with the CK flare piping system!
<Flare Machine> In recent years, due to the inability to use fire on-site and the aim to shorten construction periods, pipes and fittings are processed and assembled in factories, with flanges welded to both ends of the processed pipes, which are then brought to the site. The mainstream method on-site is prefabrication, where only the processed pipes are installed. The flare machine processes the ends of the pipes to create a flare connection using loose flanges, eliminating the need for flange welding. By using the flare machine, you can achieve "cost reduction," "shortened delivery times," and "improved quality" for processed pipes. <Flare Fitting> Flare fittings are weldless joints with flaring applied to elbows. <W Flange> With fewer bolts than standard loose flanges, the bolts, nuts, and gaskets are preset (attached), which reduces construction time. It has obtained NETIS certification. <Flare Drum> Around valves and strainers, flare drums with flanges welded on both sides of short pipes are commonly used. With flare drums, the loose flanges make bolt alignment easier, thus shortening construction time. <Flare Lap> Using flare laps allows for loose flange connections, making installation work on-site easier. It reduces welding time compared to welding flanges.
- Company:シーケー金属
- Price:Other